HALCYON P-17 INTEGRITY DECISION WORKBENCH

Synthetic benchmark basis · assessment date 20 September 2026 · fixed UK North Sea platform

Decision status: CONDITIONAL CONTINUE / NO INCREASE
Oil rate
4,800
bopd · baseline
B annulus
31–34
barg · MAASP 70
B rebuild
21.2
barg at 48 h
A annulus
109
barg · gas-lift path
SCSSV leak
0.44
L/min · limit 0.50
Potential uplift
+400–600
bopd · not yet available

Current engineering disposition

REVIEW REQUIRED
Do not approve the proposed +10% choke optimisation at this time.

Continued production at the current approved baseline can be considered conditionally, subject to IR-P17-2026-04, six-hourly B-annulus readings and escalation triggers. Evidence demonstrates sustained B-annulus behaviour and worsening rebuild, but not a proved leak location.

What changed?B pressure progressed from historical 0–3 barg to repeatable rebuild; 2026 rebuild reached 21.2 barg at 48 h. SCSSV leak increased from 0.31 to 0.44 L/min while still passing.
Trustworthy?Replacement transmitter, controlled bleed/rebuild and long-term history support genuine sustained behaviour.
Questionable?One isolated 68 barg spike and the 4 barg PTX/local-gauge disagreement.
Missing?Overdue B-annulus fingerprint sample and definitive diagnostic isolation.
MAASP meaning?Below 70 barg is not proof of acceptable integrity.

Operating envelope

ParameterCurrentApproved basis
A annulus109 barg95–115 normal
MAASP 165
B annulus31–34 barg≥15 review
≥40 escalate
MAASP 70
C annulus0.4 barg0–1 normal
MAASP 30
Gas lift4.2 MMscf/dRestriction target ≤4.3
Choke42%No increase without WI approval
Active restriction
IR-P17-2026-04 · issued 03 Sep · review/expiry 30 Sep 2026. No production increase without Well Integrity Engineer approval.

What would change the decision?

  • Immediate escalation: B ≥40 barg, rebuild >25 barg/24 h, confirmed active leak path, second barrier degradation, or C rise >3 barg.
  • Supportive evidence: validated gauges, completed fingerprint, diagnostic pressure-response evidence and stable SCSSV trend.
  • Increase gate: written WI approval, bounded mechanism, staged test envelope and enhanced surveillance.

Reasoning chain

CONTEXT → VALIDATE → DETECT → COMPARE → INTERPRET → HYPOTHESISE → ASSESS BARRIERS → ASSESS RISK → DECIDE → ACT → VERIFY → LEARN

Current state: evidence is sufficient to restrict the proposed increase, but insufficient to localise the source.